All roofing services

San Luis Valley · Salida · Buena Vista

Roof installation for new construction.

Building a home? Ascension works with new-build homeowners, builders, and general contractors. Share the plans and construction stage so Joshua can discuss the roofing system, scope, and place in the build schedule.

Discuss a new-build estimate

Roof decisions move with the construction.

On this Crestone new build, Ascension framed the roof with 14-inch TJI rafters, corrected existing framing issues, and installed burnished-slate standing seam. These views show the framing stage and the completed roofing scope while the rest of the home was still under construction.

See the Crestone new-build Roof Record
A new home under construction with roof framing in progress.
Roof framing / in progress
Metal roofing installed on the same new home while exterior construction continues.
Roofing complete / home still under construction

Plan the roof before installation begins.

The proposed system and scope should be established before work begins, with responsibilities and key roof details made clear across the construction sequence.

What helps Joshua plan your new roof.

Two crew members working together at the top of wood framing on a home under construction
Crew at work on framing
01

Share the project details

Share the property location, building type, plans if available, and current construction stage so Joshua can understand the project before the estimate.

02

Discuss the roof and building together

The roof's shape, areas where surfaces meet, and openings for vents or pipes affect the installation plan. Discuss these details alongside the timing of other construction work.

03

Keep a project record

A Roof Record can document the selected roof system, installation scope, important details, and finished result.

See what was found, why the work was recommended, and what changed.

Ascension brings the condition, recommendation, work, and final check together so homeowners can follow the reasoning behind the roof.

  1. 01Observed

    Joshua documents the roof condition and the details that may be contributing to the problem.

  2. 02Recommended

    The recommendation is tied to what was found, with the reasoning explained in plain language.

  3. 03Built

    The record shows the agreed scope, materials, and important decisions made during the work.

  4. 04Verified

    Joshua completes the final check and reviews the finished details before the project closes.

Questions before the estimate.

Who can request a new-build roofing estimate?

Ascension invites both homeowners planning a new build and builders or general contractors to request an estimate.

When should Ascension become involved in a new-build project?

Involve Ascension early enough to establish the roofing system and scope before work begins. This allows roof geometry, material decisions, penetrations, transitions, responsibilities, and construction timing to be considered together.

What information should I send about the project?

Share the property location, building type, plans if available, and current construction stage. These details help Joshua understand the project before the estimate.

Roof Installation

Start with your property and roofing needs.

Share the project location, building type, available plans, and current construction stage.